This project consists of a combined heat and power expansion into the existing plant utility system. A key factor to the success of this project is hinged upon the integration of an existing plant utilities system into the new system.
This project includes a 4.6 MW solar combustion turbine with heat recovery steam generator and a supplemental fired duct burner creating an additional 83,038 lb/hr of steam. A new utility building and electrical room to house the medium voltage equipment were installed and integrated into the existing plant infrastructure. This project was executed alongside existing plant operations with key outages coordinated to facilitate no unplanned production outages.